Some checks are pending
Bidi Control Character Guard / bidi-control-guard (push) Waiting to run
Circular Dependency Check / Check for new circular dependencies (push) Waiting to run
Citus Migration Smoke / Combined migrations on single-node Citus (push) Waiting to run
E2E Fresh Install Tests / fresh-install-e2e (push) Waiting to run
ext-v2 guardrails / Run ext-v2 guard and ESLint (push) Waiting to run
Integration Tests / Check for relevant changes (push) Waiting to run
Integration Tests / ${{ (github.event_name == 'schedule' || github.event.inputs.suite == 'full') && 'Full integration suite' || 'Tier-1 integration subset' }} (push) Blocked by required conditions
Mobile checks / Mobile lint + typecheck (push) Waiting to run
Mobile checks / Mobile unit tests (push) Waiting to run
Mobile checks / Mobile dependency audit (report) (push) Waiting to run
Mobile checks / Mobile reproducibility checks (push) Waiting to run
Secrets guard (env backups) / Ensure no tracked env backup files (push) Waiting to run
Temporal Readiness / fast-readiness (push) Waiting to run
Temporal Readiness / docker-parity (push) Waiting to run
TypeScript Type Check / Nx affected typecheck (push) Waiting to run
Unit Tests / Skipped-test budget (push) Waiting to run
Unit Tests / Nx affected unit tests (push) Waiting to run
Unit Tests / Server unit coverage (informational) (push) Waiting to run
Validate Tenant Management Schema / Check for relevant changes (push) Waiting to run
Validate Tenant Management Schema / Validate Tenant Management Schema (push) Blocked by required conditions
EE Workflows Build Guard / ee-workflows-build-guard (push) Waiting to run
Excluded: .git, node_modules, secrets/, compose.env, assemblyscript tgz Source: /opt/alga-psa on psa.joliet.tech
183 lines
5.7 KiB
Markdown
183 lines
5.7 KiB
Markdown
# Asset Management System - Project Plans
|
|
|
|
This directory contains strategic planning documents for the Asset Management System development.
|
|
|
|
## Available Plans
|
|
|
|
### [Enterprise Roadmap](./asset-management-enterprise-roadmap.md)
|
|
**24-month phased plan from current state to market-leading MSP solution**
|
|
|
|
A comprehensive roadmap that gradually builds capabilities across 6 phases:
|
|
|
|
| Phase | Duration | Investment | Target Market |
|
|
|-------|----------|------------|---------------|
|
|
| **Phase 0**: Foundation | 2 months | $40K | Internal |
|
|
| **Phase 1**: Basic MSP | 2 months | $80K | Small MSPs |
|
|
| **Phase 2**: Mid-Market | 4 months | $160K | Mid-Market MSPs |
|
|
| **Phase 3**: Advanced | 4 months | $140K | Large MSPs |
|
|
| **Phase 4**: Enterprise | 4 months | $120K | Enterprise MSPs |
|
|
| **Phase 5**: Market Leader | 8 months | $160K | All Segments |
|
|
| **TOTAL** | **24 months** | **$700K** | **Enterprise Ready** |
|
|
|
|
## Quick Reference
|
|
|
|
### Current State
|
|
- **Maturity**: 65% - Early Stage Internal Tool
|
|
- **Test Coverage**: 0%
|
|
- **Asset Capacity**: ~10K assets
|
|
- **Market Fit**: Small MSPs only (with workarounds)
|
|
|
|
### Phase 0 Priorities (NEXT 2 MONTHS)
|
|
1. ✅ **Testing Infrastructure** - Add 50+ tests, achieve 40% coverage
|
|
2. ✅ **Import System** - CSV/Excel bulk import with duplicate detection
|
|
3. ✅ **Code Quality** - Refactor large files, TypeScript strict mode
|
|
4. ✅ **UX Polish** - Loading states, error handling, bug fixes
|
|
|
|
### Critical Path to MVP (4 MONTHS)
|
|
- **Month 1-2**: Foundation (testing, import, refactoring)
|
|
- **Month 3-4**: Automation (notifications, workflows, reporting)
|
|
- **Outcome**: Viable for small-to-mid market MSPs
|
|
|
|
### Timeline to Enterprise (18 MONTHS)
|
|
- **Months 1-4**: Foundation + Basic MSP features
|
|
- **Months 4-8**: N-able RMM integration (CRITICAL)
|
|
- **Months 8-12**: Multi-RMM + configuration management
|
|
- **Months 12-16**: Client portal + advanced analytics
|
|
- **Months 16-24**: ML/AI + mobile app + innovation
|
|
|
|
## Success Metrics
|
|
|
|
### By Month 4 (Phase 1 Complete)
|
|
- Test coverage: 50%+
|
|
- Import: 1,000 assets in <2 minutes
|
|
- Automated notifications: >98% delivery
|
|
- Customer adoption: 5+ small MSPs
|
|
|
|
### By Month 8 (Phase 2 Complete)
|
|
- N-able integration: Live and syncing
|
|
- Sync speed: 10,000 assets in <10 minutes
|
|
- Test coverage: 60%+
|
|
- Customer adoption: 3+ mid-market MSPs
|
|
|
|
### By Month 16 (Phase 4 Complete)
|
|
- Multi-RMM: 3 platforms supported
|
|
- Client portal: 70% adoption
|
|
- Test coverage: 75%+
|
|
- Customer adoption: 3+ enterprise MSPs
|
|
|
|
### By Month 24 (Phase 5 Complete)
|
|
- ML prediction: >75% accuracy
|
|
- Mobile app: Published on iOS/Android
|
|
- Test coverage: 80%+
|
|
- ARR: $1.2M
|
|
|
|
## Resource Requirements
|
|
|
|
### Team by Phase
|
|
- **Phase 0-1**: 2.5-3 FTE (2 engineers, 0.5 QA, 0.5 designer)
|
|
- **Phase 2-3**: 4 FTE (2 engineers, 1 specialist, 0.5 QA, 0.5 designer)
|
|
- **Phase 4**: 3.5 FTE (1.5 engineers, 0.5 QA, 0.5 designer, 1 specialist)
|
|
- **Phase 5**: 5 FTE (2 engineers, 1 ML, 1 mobile, 0.5 QA, 0.5 other)
|
|
|
|
### Budget Summary
|
|
- **Engineering Labor**: $560K (80%)
|
|
- **QA/Testing**: $70K (10%)
|
|
- **Specialists**: $36K (5%)
|
|
- **Infrastructure & Tools**: $17K (2.5%)
|
|
- **Contingency**: $17K (2.5%)
|
|
- **TOTAL**: $700K
|
|
|
|
## ROI Projection
|
|
|
|
| Metric | Month 8 | Month 16 | Month 24 |
|
|
|--------|---------|----------|----------|
|
|
| Customers | 8 | 33 | 90 |
|
|
| ARR | $150K | $500K | $1.2M |
|
|
| Cumulative Investment | $280K | $520K | $700K |
|
|
| ROI | -46% | -4% | +71% |
|
|
| Breakeven | - | Month 14 | ✅ |
|
|
|
|
## Critical Dependencies
|
|
|
|
### External
|
|
- N-able API access (Phase 2)
|
|
- ConnectWise API access (Phase 3)
|
|
- Datto API access (Phase 3)
|
|
- Cloud provider APIs (Phase 5)
|
|
|
|
### Internal
|
|
- Team hiring and retention
|
|
- QA infrastructure and processes
|
|
- Customer pilot program
|
|
- Executive sponsorship
|
|
|
|
## Risk Factors
|
|
|
|
### High Priority Risks
|
|
1. ⚠️ **Testing Debt** - Zero tests = production risk
|
|
- **Mitigation**: Phase 0 priority, no features until 40% coverage
|
|
2. ⚠️ **RMM Integration Complexity** - Underestimated effort
|
|
- **Mitigation**: Early spike, specialist hire, buffer time
|
|
3. ⚠️ **Performance at Scale** - 50K+ assets untested
|
|
- **Mitigation**: Load testing Phase 2, database optimization
|
|
|
|
### Medium Priority Risks
|
|
4. ⚠️ **Team Capacity** - Resource constraints
|
|
- **Mitigation**: Flexible timeline, contractors, scope management
|
|
5. ⚠️ **API Changes** - RMM providers change APIs
|
|
- **Mitigation**: Versioning, monitoring, automated tests
|
|
|
|
## Next Actions
|
|
|
|
### Week 1
|
|
- [ ] Secure executive approval for roadmap
|
|
- [ ] Approve $700K budget
|
|
- [ ] Begin team hiring
|
|
- [ ] Set up development infrastructure
|
|
|
|
### Week 2
|
|
- [ ] Kickoff Phase 0
|
|
- [ ] Configure testing framework
|
|
- [ ] Begin writing first tests
|
|
- [ ] Start import system design
|
|
|
|
### Month 1
|
|
- [ ] Achieve 40% test coverage
|
|
- [ ] Complete CSV import
|
|
- [ ] Refactor large files
|
|
- [ ] Polish UX issues
|
|
|
|
### Month 2
|
|
- [ ] Complete Phase 0
|
|
- [ ] Launch import system
|
|
- [ ] Begin Phase 1 (notifications)
|
|
- [ ] Recruit pilot customers
|
|
|
|
## Documentation Standards
|
|
|
|
All plans in this directory should include:
|
|
|
|
1. **Executive Summary** - TL;DR with key metrics
|
|
2. **Current State Assessment** - Where we are today
|
|
3. **Target State** - Where we're going
|
|
4. **Phased Approach** - How we get there
|
|
5. **Deliverables** - Specific, measurable outcomes
|
|
6. **Success Metrics** - How we measure progress
|
|
7. **Resource Requirements** - Team and budget needs
|
|
8. **Risk Management** - What could go wrong
|
|
9. **Timeline** - When things happen
|
|
10. **Exit Criteria** - What "done" looks like
|
|
|
|
## Updates and Reviews
|
|
|
|
- **Update Frequency**: Monthly during active development
|
|
- **Review Frequency**: Quarterly with stakeholders
|
|
- **Ownership**: Product Management
|
|
- **Approvers**: CTO, VP Engineering, VP Product, CFO
|
|
|
|
---
|
|
|
|
**Last Updated**: 2025-01-11
|
|
**Document Owner**: Product Management Team
|
|
**Status**: Pending Approval
|