PSA/docs/extensions/softwareone/softwareone-extension-phase6-tasks.md
Hermes 284313f908
Some checks are pending
Bidi Control Character Guard / bidi-control-guard (push) Waiting to run
Circular Dependency Check / Check for new circular dependencies (push) Waiting to run
Citus Migration Smoke / Combined migrations on single-node Citus (push) Waiting to run
E2E Fresh Install Tests / fresh-install-e2e (push) Waiting to run
ext-v2 guardrails / Run ext-v2 guard and ESLint (push) Waiting to run
Integration Tests / Check for relevant changes (push) Waiting to run
Integration Tests / ${{ (github.event_name == 'schedule' || github.event.inputs.suite == 'full') && 'Full integration suite' || 'Tier-1 integration subset' }} (push) Blocked by required conditions
Mobile checks / Mobile lint + typecheck (push) Waiting to run
Mobile checks / Mobile unit tests (push) Waiting to run
Mobile checks / Mobile dependency audit (report) (push) Waiting to run
Mobile checks / Mobile reproducibility checks (push) Waiting to run
Secrets guard (env backups) / Ensure no tracked env backup files (push) Waiting to run
Temporal Readiness / fast-readiness (push) Waiting to run
Temporal Readiness / docker-parity (push) Waiting to run
TypeScript Type Check / Nx affected typecheck (push) Waiting to run
Unit Tests / Skipped-test budget (push) Waiting to run
Unit Tests / Nx affected unit tests (push) Waiting to run
Unit Tests / Server unit coverage (informational) (push) Waiting to run
Validate Tenant Management Schema / Check for relevant changes (push) Waiting to run
Validate Tenant Management Schema / Validate Tenant Management Schema (push) Blocked by required conditions
EE Workflows Build Guard / ee-workflows-build-guard (push) Waiting to run
Initial import of AlgaPSA codebase from PSA server
Excluded: .git, node_modules, secrets/, compose.env, assemblyscript tgz

Source: /opt/alga-psa on psa.joliet.tech
2026-06-22 16:12:17 -05:00

389 lines
14 KiB
Markdown

# Phase 6: Production Readiness - Detailed Subtasks
**Last Updated**: 2025-06-14
**Prerequisites**: Phases 4 (Descriptor Architecture) and 5 (API Integration) completed
**Total Estimated Effort**: 160 hours
## Overview
Phase 6 ensures the SoftwareOne extension is production-ready with comprehensive testing, documentation, security hardening, performance optimization, and deployment procedures.
## 6.1 Testing & Validation (60 hours total)
### 6.1.1 Unit Test Infrastructure Setup (8 hours)
**Description**: Set up comprehensive testing framework for descriptors and components
**Files to create/modify**:
- `/extensions/softwareone-ext/vitest.config.ts` - Test configuration
- `/extensions/softwareone-ext/src/__tests__/setup.ts` - Test setup and global mocks
- `/extensions/softwareone-ext/src/__tests__/utils/test-helpers.ts` - Testing utilities
- `/extensions/softwareone-ext/src/__tests__/utils/descriptor-test-utils.ts` - Descriptor testing helpers
**Key implementation details**:
- Configure Vitest for descriptor-based architecture
- Create mock descriptor context and handlers
- Set up coverage reporting (minimum 80%)
- Configure snapshot testing for descriptors
- Mock ExtensionStorageService and API calls
- Create test factories for agreements/statements
**Dependencies**: None
**Estimated effort**: 8 hours
### 6.1.2 Descriptor Unit Tests (12 hours)
**Description**: Test all descriptors and their handlers
**Files to create**:
- `/extensions/softwareone-ext/src/__tests__/descriptors/navigation.test.ts`
- `/extensions/softwareone-ext/src/__tests__/descriptors/settings.test.ts`
- `/extensions/softwareone-ext/src/__tests__/descriptors/agreements-list.test.ts`
- `/extensions/softwareone-ext/src/__tests__/descriptors/agreement-detail.test.ts`
- `/extensions/softwareone-ext/src/__tests__/descriptors/statements-list.test.ts`
- `/extensions/softwareone-ext/src/__tests__/descriptors/statement-detail.test.ts`
**Key implementation details**:
- Test descriptor structure validation
- Test handler execution with various inputs
- Test error handling and edge cases
- Test security context isolation
- Verify no direct DOM manipulation
- Test data transformation logic
**Dependencies**: 6.1.1
**Estimated effort**: 12 hours
### 6.1.3 API Client Tests (8 hours)
**Description**: Comprehensive testing of SoftwareOne API integration
**Files to create**:
- `/extensions/softwareone-ext/src/__tests__/api/softwareOneClient.test.ts`
- `/extensions/softwareone-ext/src/__tests__/api/auth.test.ts`
- `/extensions/softwareone-ext/src/__tests__/api/retry-logic.test.ts`
- `/extensions/softwareone-ext/src/__tests__/api/rate-limiting.test.ts`
**Key implementation details**:
- Mock API responses for all endpoints
- Test authentication flow and token refresh
- Test exponential backoff retry logic
- Test rate limiting handling (429 responses)
- Test request/response transformation
- Test error handling for various HTTP codes
- Test pagination cursor management
**Dependencies**: None
**Estimated effort**: 8 hours
### 6.1.4 Service & Hook Tests (10 hours)
**Description**: Test business logic services and React hooks
**Files to create**:
- `/extensions/softwareone-ext/src/__tests__/services/syncService.test.ts`
- `/extensions/softwareone-ext/src/__tests__/services/mappingService.test.ts`
- `/extensions/softwareone-ext/src/__tests__/services/importService.test.ts`
- `/extensions/softwareone-ext/src/__tests__/hooks/useAgreements.test.ts`
- `/extensions/softwareone-ext/src/__tests__/hooks/useStatements.test.ts`
**Key implementation details**:
- Test sync queue management
- Test service mapping algorithms
- Test import validation logic
- Test React Query cache behavior
- Test optimistic updates
- Test error recovery flows
**Dependencies**: 6.1.1
**Estimated effort**: 10 hours
### 6.1.5 Integration Tests (12 hours)
**Description**: Test complete workflows end-to-end
**Files to create**:
- `/extensions/softwareone-ext/src/__tests__/integration/activation-flow.test.ts`
- `/extensions/softwareone-ext/src/__tests__/integration/import-flow.test.ts`
- `/extensions/softwareone-ext/src/__tests__/integration/sync-flow.test.ts`
- `/extensions/softwareone-ext/src/__tests__/integration/settings-flow.test.ts`
**Key implementation details**:
- Test complete activation workflow
- Test statement import to invoice
- Test data synchronization flows
- Test settings save/load cycle
- Test multi-tenant isolation
- Test permission enforcement
**Dependencies**: 6.1.1, 6.1.2, 6.1.3
**Estimated effort**: 12 hours
### 6.1.6 E2E Tests with Playwright (10 hours)
**Description**: Browser-based end-to-end testing
**Files to create**:
- `/extensions/softwareone-ext/playwright.config.ts`
- `/extensions/softwareone-ext/e2e/auth.setup.ts`
- `/extensions/softwareone-ext/e2e/settings.spec.ts`
- `/extensions/softwareone-ext/e2e/agreements.spec.ts`
- `/extensions/softwareone-ext/e2e/statements.spec.ts`
- `/extensions/softwareone-ext/e2e/full-workflow.spec.ts`
**Key implementation details**:
- Test extension loading and registration
- Test navigation and routing
- Test form interactions
- Test data persistence
- Test error scenarios
- Performance benchmarking
- Visual regression tests
**Dependencies**: All previous testing tasks
**Estimated effort**: 10 hours
## 6.2 Documentation (40 hours total)
### 6.2.1 User Documentation (12 hours)
**Description**: Comprehensive end-user documentation
**Files to create**:
- `/extensions/softwareone-ext/docs/USER_GUIDE.md` - Complete user guide
- `/extensions/softwareone-ext/docs/QUICK_START.md` - Getting started guide
- `/extensions/softwareone-ext/docs/FAQ.md` - Frequently asked questions
- `/extensions/softwareone-ext/docs/TROUBLESHOOTING.md` - Common issues and solutions
- `/extensions/softwareone-ext/docs/screenshots/` - UI screenshots directory
**Key implementation details**:
- Step-by-step setup instructions
- Feature walkthroughs with screenshots
- Common use case scenarios
- Billing workflow examples
- Service mapping guide
- Import process documentation
- Video tutorial scripts
**Dependencies**: None
**Estimated effort**: 12 hours
### 6.2.2 Developer Documentation (10 hours)
**Description**: Technical documentation for developers
**Files to create**:
- `/extensions/softwareone-ext/docs/ARCHITECTURE.md` - Descriptor architecture overview
- `/extensions/softwareone-ext/docs/API_REFERENCE.md` - Complete API documentation
- `/extensions/softwareone-ext/docs/DESCRIPTOR_GUIDE.md` - How to create descriptors
- `/extensions/softwareone-ext/docs/SECURITY.md` - Security considerations
- `/extensions/softwareone-ext/docs/diagrams/` - Architecture diagrams
**Key implementation details**:
- Descriptor pattern explanation
- Component lifecycle documentation
- State management patterns
- Security best practices
- Performance optimization guide
- Extension points for customization
- Migration guide from React components
**Dependencies**: None
**Estimated effort**: 10 hours
### 6.2.3 API Integration Documentation (8 hours)
**Description**: Detailed SoftwareOne API integration guide
**Files to create**:
- `/extensions/softwareone-ext/docs/SOFTWAREONE_API.md` - API integration details
- `/extensions/softwareone-ext/docs/WEBHOOK_SETUP.md` - Webhook configuration
- `/extensions/softwareone-ext/docs/DATA_MAPPING.md` - Data mapping reference
- `/extensions/softwareone-ext/docs/api-examples/` - Example requests/responses
**Key implementation details**:
- Authentication setup guide
- API endpoint reference
- Rate limiting guidelines
- Error code reference
- Webhook event types
- Data field mappings
- Common integration patterns
**Dependencies**: None
**Estimated effort**: 8 hours
### 6.2.4 Deployment Documentation (10 hours)
**Description**: Production deployment and operations guide
**Files to create**:
- `/extensions/softwareone-ext/docs/DEPLOYMENT.md` - Deployment guide
- `/extensions/softwareone-ext/docs/MONITORING.md` - Monitoring setup
- `/extensions/softwareone-ext/docs/PERFORMANCE.md` - Performance tuning
- `/extensions/softwareone-ext/docs/BACKUP_RECOVERY.md` - Backup procedures
- `/extensions/softwareone-ext/docs/UPGRADE_GUIDE.md` - Version upgrade process
**Key implementation details**:
- Production checklist
- Environment variables
- Resource requirements
- Monitoring metrics
- Log aggregation setup
- Performance benchmarks
- Disaster recovery procedures
- Rolling update strategy
**Dependencies**: None
**Estimated effort**: 10 hours
## 6.3 Deployment & Monitoring (60 hours total)
### 6.3.1 Security Hardening (12 hours)
**Description**: Implement production security measures
**Files to create/modify**:
- `/extensions/softwareone-ext/src/security/encryption.ts` - API key encryption
- `/extensions/softwareone-ext/src/security/csp-config.ts` - Content Security Policy
- `/extensions/softwareone-ext/src/security/input-validation.ts` - Input sanitization
- `/extensions/softwareone-ext/src/security/rate-limiter.ts` - Request rate limiting
- `/server/src/middleware/extension-security.ts` - Security middleware
**Key implementation details**:
- Implement AES-256 encryption for API keys
- Configure strict CSP headers
- Add input validation for all user inputs
- Implement rate limiting per tenant
- Add request signing for API calls
- Implement CSRF protection
- Add security headers
**Dependencies**: None
**Estimated effort**: 12 hours
### 6.3.2 Performance Optimization (10 hours)
**Description**: Optimize extension for production performance
**Files to create/modify**:
- `/extensions/softwareone-ext/src/utils/cache-manager.ts` - Caching implementation
- `/extensions/softwareone-ext/src/utils/virtual-scroll.ts` - Virtual scrolling
- `/extensions/softwareone-ext/src/utils/lazy-loader.ts` - Component lazy loading
- `/extensions/softwareone-ext/webpack.config.prod.js` - Production build config
**Key implementation details**:
- Implement Redis caching layer
- Add virtual scrolling for large lists
- Optimize bundle size (<10KB)
- Implement code splitting
- Add service worker for offline support
- Optimize descriptor parsing
- Implement request debouncing
**Dependencies**: None
**Estimated effort**: 10 hours
### 6.3.3 Monitoring & Logging (10 hours)
**Description**: Implement comprehensive monitoring
**Files to create**:
- `/extensions/softwareone-ext/src/monitoring/metrics.ts` - Custom metrics
- `/extensions/softwareone-ext/src/monitoring/logger.ts` - Structured logging
- `/extensions/softwareone-ext/src/monitoring/error-reporter.ts` - Error tracking
- `/extensions/softwareone-ext/src/monitoring/health-check.ts` - Health endpoints
**Key implementation details**:
- Integrate with Prometheus metrics
- Implement structured JSON logging
- Add Sentry error tracking
- Create custom business metrics
- Add performance monitoring
- Implement audit logging
- Add health check endpoints
**Dependencies**: None
**Estimated effort**: 10 hours
### 6.3.4 Multi-tenant Support (8 hours)
**Description**: Ensure proper multi-tenant isolation
**Files to create/modify**:
- `/extensions/softwareone-ext/src/tenant/context.ts` - Tenant context management
- `/extensions/softwareone-ext/src/tenant/isolation.ts` - Data isolation
- `/extensions/softwareone-ext/src/tenant/permissions.ts` - Tenant permissions
- `/server/src/lib/extensions/tenant-manager.ts` - Tenant management
**Key implementation details**:
- Implement tenant context injection
- Ensure data isolation between tenants
- Add tenant-specific caching
- Implement permission boundaries
- Add tenant configuration override
- Ensure no data leakage
- Test concurrent tenant access
**Dependencies**: 6.3.1
**Estimated effort**: 8 hours
### 6.3.5 Deployment Automation (10 hours)
**Description**: Create automated deployment pipeline
**Files to create**:
- `/extensions/softwareone-ext/.github/workflows/deploy.yml` - GitHub Actions
- `/extensions/softwareone-ext/scripts/build.sh` - Build script
- `/extensions/softwareone-ext/scripts/deploy.sh` - Deployment script
- `/extensions/softwareone-ext/scripts/rollback.sh` - Rollback script
- `/extensions/softwareone-ext/docker/Dockerfile` - Container configuration
**Key implementation details**:
- Automated testing on PR
- Build and version tagging
- Container image creation
- Deployment to staging
- Smoke test execution
- Production deployment approval
- Automated rollback capability
**Dependencies**: 6.1 (all testing)
**Estimated effort**: 10 hours
### 6.3.6 Production Readiness Checklist (10 hours)
**Description**: Final production validation and launch preparation
**Files to create**:
- `/extensions/softwareone-ext/docs/PRODUCTION_CHECKLIST.md` - Launch checklist
- `/extensions/softwareone-ext/scripts/validate-production.sh` - Validation script
- `/extensions/softwareone-ext/monitoring/dashboards/` - Monitoring dashboards
- `/extensions/softwareone-ext/runbooks/` - Operational runbooks
**Key implementation details**:
- Security audit completion
- Performance benchmarking
- Load testing results
- Monitoring dashboard setup
- Alert configuration
- Backup verification
- Disaster recovery test
- Documentation review
- Training materials
- Support procedures
**Dependencies**: All previous tasks
**Estimated effort**: 10 hours
## Summary
### Total Effort by Section:
- **6.1 Testing & Validation**: 60 hours
- **6.2 Documentation**: 40 hours
- **6.3 Deployment & Monitoring**: 60 hours
- **Total Phase 6**: 160 hours
### Critical Path:
1. Start with 6.1.1 (Test Infrastructure) - enables all testing
2. Parallel tracks:
- Testing track: 6.1.2 6.1.3 6.1.4 6.1.5 6.1.6
- Documentation track: 6.2.1, 6.2.2, 6.2.3, 6.2.4 (can run in parallel)
- Security/Performance: 6.3.1, 6.3.2 (can start immediately)
3. Integration: 6.3.3, 6.3.4 (after security)
4. Deployment: 6.3.5 (after all testing)
5. Final validation: 6.3.6 (last step)
### Key Success Metrics:
- Test coverage > 80%
- Bundle size < 10KB
- API response time < 200ms
- Zero security vulnerabilities
- 99.9% uptime target
- Complete documentation coverage
- Automated deployment pipeline
- Multi-tenant isolation verified