PRD — Multi-Active Contracts Per Client
- Slug:
multi-active-contracts-per-client - Date:
2026-03-20 - Status: Draft
Summary
Remove the application-level “one active contract per client” rule so a client can hold multiple concurrent active contract assignments, while preserving the current invoice boundary that each generated invoice belongs to exactly one client_contract_id.
This plan is intentionally comprehensive. It covers the obvious billing-contract wizard blockers, the shared/server-side active-contract guards, the duplicated packages/clients assignment rules, assignment-scoped UI identity problems, recurring preview/generation scope, bucket/billing-cycle ambiguity, docs, fixtures, and regression coverage.
The plan does not redesign invoice scope to support mixed-contract invoices. Instead, it preserves the current contract-scoped invoice/PO model and makes the rest of the system safe and explicit around that boundary.
Problem
The current codebase has no database constraint that limits a client to one active contract, but multiple app-layer paths still behave as if that rule were fundamental:
- billing contract creation/edit flows disable clients that already have an active contract
- billing and clients actions/models reject concurrent active assignment windows
- contract header activation/reactivation paths ask “does this client have any other active contract?” rather than reasoning about the target assignment
- some
packages/clientsscreens still key identity bycontract_idinstead ofclient_contract_id - recurring preview/generation for client-cadence candidates can still re-expand work at
client + invoice windowscope instead of the selected contract candidate - bucket usage and billing-cycle summaries still collapse multiple active assignments to one winner
This produces three classes of failure:
- Users are blocked from creating a second active contract for the same client even though the schema allows it.
- If concurrent active assignments are forced in through some paths, UI reads and billing execution can mis-associate data.
- Historical simplifications around one contract per invoice/PO are only partially documented, so engineers cannot tell which “single contract” assumptions are intended behavior and which are accidental leftovers.
Goals
- Allow a single client to hold multiple concurrent active
client_contractsrows. - Remove blanket UI and action-layer blocking based on “client already has an active contract.”
- Make
client_contract_idthe canonical identity for assignment-scoped UI, reads, and execution. - Preserve the current invariant that an invoice belongs to exactly one
client_contract_id. - Ensure recurring due-work preview/generation runs against the selected assignment/candidate scope, not an entire client window.
- Remove implicit “pick the first active contract” behavior from summary and usage-resolution surfaces.
- Leave docs, tests, and fixtures in a state where the removed rule cannot silently creep back in.
Non-goals
- Supporting mixed-contract invoices.
- Supporting multiple POs on one invoice.
- Redesigning accounting export payloads for invoices that span multiple contract assignments.
- Changing tax, credit, or export semantics beyond what is required to preserve single-contract invoices safely.
- Reworking every legacy contract/report label in the product; this plan only covers labels whose current wording becomes materially wrong for this behavior.
- Adding new schema constraints or migrations unless implementation discovers a missing index or helper column is required for correctness.
Target Users / Primary Flows
-
Billing admin
- Creates a new active contract for a client that already has another active contract.
- Configures recurring lines on both contracts.
- Sees separate automatic-invoice candidates per contract assignment and can preview/generate them independently.
-
Client/account manager
- Opens the client billing tab.
- Sees multiple active assignments for the same client, including cases where they share the same underlying
contract_id. - Adds, edits, or removes lines against the intended assignment without ambiguity.
-
Finance/admin
- Reviews invoice history, PO consumption, and contract detail.
- Continues to reason about one invoice belonging to one contract assignment.
-
Engineer/support
- Reads code, docs, or test fixtures.
- Can tell the difference between:
- multi-active assignments are allowed
- invoices are still single-assignment scoped
- ambiguous legacy surfaces must fail explicitly rather than guess
Product Decisions
1. Multi-active assignments are allowed
For this plan, “remove the single-active-contract rule” means a client may have multiple concurrent active assignments, including overlapping date windows.
That means the old overlap validators in shared and packages/clients assignment writes are no longer valid as a product rule.
2. Invoices remain single-assignment scoped
This plan preserves the existing invoice/PO boundary:
- each invoice resolves to exactly one
client_contract_id - PO required/overage/consumption remain invoice-header behavior against one assignment
- accounting exports continue to emit one invoice-level PO/reference
Allowing multi-active contracts therefore requires the system to keep due-work candidates and invoice execution contract-scoped, not to merge them.
3. client_contract_id is the canonical identity
Any UI, read, or execution path that is assignment-scoped must use client_contract_id, not contract_id, to identify the target assignment.
Where two active assignments share the same contract_id, contract-header identity is not sufficient.
4. Ambiguous legacy resolution must stop guessing
Surfaces that currently “pick the latest active contract” or “pick the first matching assignment” must be changed to:
- operate from explicit assignment identity, or
- fail with an explicit ambiguity error
The system must not silently attach usage, lines, or invoices to whichever active assignment sorts first.
5. Mixed-currency rule is separate
The existing wizard-level mixed-currency restriction is related but not identical to the single-active-contract rule.
- This plan preserves mixed-currency blocking as a separate policy.
- The policy applies independently of multi-active assignment support: multiple active assignments are allowed, but creating active assignments for the same client in different currencies remains blocked unless a future plan explicitly changes it.
- Removing the single-active-contract singleton must not implicitly remove this mixed-currency guard.
UX / UI Notes
- Billing contract creation/edit screens must allow selecting a client even if they already have another active contract.
- Any warning copy that still references “terminate their current contract first” must be removed or replaced.
- Assignment management UIs must display enough identity to distinguish multiple active assignments cleanly, especially when they share the same base contract header.
- Contract-line add/edit/remove flows in
packages/clientsmust show or carry explicit assignment context. - Billing-cycle summaries should no longer imply there is only one active contract for a client.
Requirements
Functional Requirements
- Billing contract UI flows must stop disabling or rejecting clients because another active contract exists.
- Contract header activate/restore/reactivate flows must stop blanket-checking for “any other active contract.”
- Shared/action/model helpers that encode the singleton active-contract rule must be removed, renamed, or repurposed so they no longer act as write/activation blockers.
- Assignment create/update flows must allow concurrent active windows.
- Existing invoiced-period date guards must remain in place; removing the singleton rule must not allow users to move assignment dates across already invoiced periods.
packages/clientsassignment management must useclient_contract_idas the primary identity in selection, post-create refresh, edit, and display paths.- Contract-line reads in
packages/clientsmust be assignment-scoped, not derived by joining oncontract_idalone. - Contract-line mutation flows must either operate assignment-scoped or make explicit when they are mutating shared header-level data.
- Recurring due-work must stay split by contract assignment so multi-active clients do not collapse into one invoice candidate.
- Recurring preview and generation must execute against the selected candidate/assignment scope, not the whole client invoice window.
- Fixed recurring charge persistence must not merge charges from different concurrent assignments that share the same template/base line identity.
- Client-cadence materialization-gap blocking must not block unrelated assignments for the same client/window.
- BillingCycles must no longer collapse multiple active assignments to a single displayed contract.
- Bucket usage period resolution must stop picking “the latest active assignment” when multiple overlapping bucket-bearing assignments exist.
- Report/export surfaces that are already assignment-safe may remain functionally unchanged, but labeling and tests must reflect assignment semantics where current wording becomes misleading.
- The final plan and docs must explicitly state that:
- multi-active assignments are allowed
- invoices remain single-assignment scoped
- mixed-contract invoice redesign is out of scope
Non-functional Requirements
- No hidden fallback behavior. If a surface cannot disambiguate an assignment safely, it must fail explicitly.
- The final architecture should reduce duplicated validation logic between
shared,packages/billing, andpackages/clients. - DB-backed integration coverage must exercise real concurrent active assignments against migrated schema.
- Test helpers must be capable of creating concurrent assignments intentionally, rather than only through the old single-assignment shape.
Data / API / Integration Notes
- No schema change is currently required to allow multiple active assignments; existing migrations only enforce uniqueness by assignment identity, not by client active status.
invoices.client_contract_idremains the invoice-level assignment reference and must stay authoritative in this plan.invoice_items.client_contract_idand recurring candidate grouping already provide the seam for contract-scoped invoice execution; implementation should lean on that instead of broadening invoice scope.- Shared helper naming should reflect actual semantics:
- “current active assignment(s)” if date-aware readers remain for reporting/diagnostics
- never a blanket business invariant if the product no longer wants one
Risks
- The biggest correctness risk is recurring execution: allowing concurrent active contracts without fixing selected-candidate execution can cause preview/generation to fan back out to the whole client window.
- The biggest UI risk is
packages/clients, where several screens still behave as ifcontract_iduniquely identifies the active assignment. - The biggest ambiguity risk is bucket usage: without explicit assignment identity or failure behavior, usage can be attached to the wrong contract.
- The biggest scope-creep risk is invoice redesign. Supporting mixed-contract invoices would cascade into PO consumption, export adapters, invoice queries, and contract views. This plan explicitly avoids that expansion.
Rollout / Migration
- Define and document the preserved boundary: multi-active assignments allowed, single-assignment invoices preserved.
- Remove the singleton UI and action-layer blockers.
- Refactor assignment identity in
packages/clients. - Fix recurring preview/generation and fixed-charge assignment attribution.
- Fix secondary ambiguity surfaces such as billing-cycle summaries and bucket usage.
- Widen fixtures and DB-backed tests so concurrent-assignment cases become first-class regression coverage.
- Update docs and prior-plan references that encode the removed singleton rule.
No backfill migration is required for historical rows. Existing rows created under the singleton rule remain valid; the behavior change is in runtime guards and scoping.
Open Questions
- For ambiguous bucket usage when multiple overlapping bucket-bearing assignments match the same client/service/date, should the product require explicit assignment identity upstream or fail at billing time with a user-facing ambiguity error?
- Are there any remaining UI surfaces that should summarize “active assignments” rather than “contracts” once this plan is complete?
Acceptance Criteria
- A user can create and activate a second active contract for a client who already has another active contract.
- The client billing/configuration UI can display and edit multiple active assignments for the same client without conflating them.
- Automatic invoice candidates remain separated by contract assignment for multi-active clients.
- Previewing or generating one selected recurring candidate does not re-expand into all due work for that client/window.
- Bucket/billing-cycle surfaces no longer silently pick one active assignment when several exist.
- Existing invoice/PO/export behavior remains single-assignment scoped and continues to work for multi-active clients.
- Tests, fixtures, docs, and runbooks no longer encode “one active contract per client” as a live invariant.